<dd id="2y0os"><s id="2y0os"></s></dd><code id="2y0os"><abbr id="2y0os"></abbr></code>
  • <rt id="2y0os"><abbr id="2y0os"></abbr></rt><ul id="2y0os"><source id="2y0os"></source></ul>
    <menu id="2y0os"><kbd id="2y0os"></kbd></menu>
    <dd id="2y0os"><s id="2y0os"></s></dd>
    <center id="2y0os"><td id="2y0os"></td></center>
    <tbody id="2y0os"></tbody>

    The Foundation 3

    Date: 2024.02.23

    Wailuo Offshore Wind Power Project, located in Zhanjiang, Guangdong province,is plannaed to be equipped with 36 sets of MySE5.5-155 wind turbines with a total capacity of 198MW. The windfarm has the medium-weathered rock stratum with sandy soil and clay geology, the monopile foundation is finally chosen for the purpose achieve cost optimization that depend on the diameter of 6.5-7m which is applicable within water depth of 19m through the multiple round of iterative computations jointly carried out by the design institute and MingYang.The construction of the first monopile foundation is completed before June 30, 2018.


    97国产一区二区三区视频,欧美伊久线香蕉观新在线,国产成年无码久久久久下载,久久99热精品免费观看 国产一级一交一乱视频 成a在线观看视频播放
    <dd id="2y0os"><s id="2y0os"></s></dd><code id="2y0os"><abbr id="2y0os"></abbr></code>
  • <rt id="2y0os"><abbr id="2y0os"></abbr></rt><ul id="2y0os"><source id="2y0os"></source></ul>
    <menu id="2y0os"><kbd id="2y0os"></kbd></menu>
    <dd id="2y0os"><s id="2y0os"></s></dd>
    <center id="2y0os"><td id="2y0os"></td></center>
    <tbody id="2y0os"></tbody>